edge.by truckaurbus.
Talk to the desk

Products

Who you are

The record

Research

Equipment, Energy & Capacity Investment

Invest in the constraint that matters.

Compare equipment, operating and energy options against terminal demand and service requirements.

Ports & Logistics Infrastructure Scoping programme

edge. Equipment & capacityIllustrative
Size the operating requirementCapacity scenario · before pricing the investment
12 h operating window8 min service per visit
Calculated capacity420 arrivals
Five positions cover the assumed daily volume. Arrival peaks still need testing.
Base configuration60 unservedFive-position scenario30 visits spare
For

Mechanical engineering, terminal planning, operations, finance and investment teams

The output

A capacity and investment brief with scenarios, dependencies and procurement conditions.

Engagement

A scoped expansion programme

What you receive

An investment case tied to the duty.

Capacity requirement

Demand and service assumptions linked to the equipment and operating resources required.

Equipment and energy scenarios

Options examined for availability, maintenance, charging or fuelling and relevant infrastructure.

Whole-life comparison

Acquisition, service, energy, funding and exit assumptions represented within a consistent scope.

Investment conditions

Supplier commitments, technical confirmations and dependencies to resolve before approval.

Illustrative view of truck lanes, containers and handling equipment at a port
Operating contextEDGE / PORTS

An illustrative engagement

Electrifying a yard-tractor operation

A terminal compares an electric yard-tractor package with its current operating arrangement, including charging windows, peak power and spare-equipment requirements.

The review file connects
01

Duty and shift records

02

Vehicle and charging offers

03

Maintenance and site-power constraints

Explore the working sampleProposed use case · not a customer result

How it works

From the source to the receiving team.

  1. 01

    Define the service requirement

    Agree the cargo flow, demand scenarios, operating rules and target service level.

  2. 02

    Assess current capacity

    Review equipment availability, duty, maintenance and observed constraints.

  3. 03

    Compare viable options

    Evaluate packages and relevant operating or simulation scenarios with technical specialists.

  4. 04

    Prepare the investment case

    Present the supported recommendation, sensitivities and required confirmations.

Scope & evaluation

Agree the evidence.
Define a useful result.

Use the details below to assess fit with your workflow.

01 Evidence requirements5 inputs
  • Demand and cargo-flow records
  • Equipment duty and availability history
  • Maintenance and staffing requirements
  • Equipment, service and funding offers
  • Energy, charging and infrastructure constraints
02 Evaluation measures4 measures
  • Capacity under agreed demand scenarios
  • Equipment availability and utilisation
  • Sensitivity to energy and downtime assumptions
  • Material procurement conditions resolved
03 Scope and outputs in detail

The programme evaluates the equipment needed to deliver a specified service, considering demand patterns, handling rules, maintenance, staffing and energy. It can support ownership, lease or electrification decisions for a defined terminal operation.

Outputs to assess

  • An equipment and charging scenario
  • Comparable whole-life economics
  • An investment brief with technical conditions

Scope, permissions, integrations and acceptance criteria are agreed before work begins. Your authorised team retains the institutional decision.

Questions

Does every engagement require a full terminal simulation?

The method follows the decision and available evidence. Where detailed simulation or engineering assessment is necessary, specialist scope and responsibilities are agreed.

Can leased and owned equipment be compared?

Yes. The comparison represents service obligations, availability assumptions, financing and exit terms consistently for each viable package.

How are supplier performance claims treated?

Each claim retains its source, operating conditions and confirmation status. Material assumptions are tested or assigned for supplier and technical verification.

The next conversation

Start with this workflow.

Bring a representative set of records and the team responsible for assessing the output.

Start a conversation

Talk to the desk.

Tell us who you are and the decision you are pricing. The first conversation costs nothing. A reply comes on working days.

Or write to [email protected].