edge.by truckaurbus.
Talk to the desk

Products

Who you are

The record

Research

Landside Flow & Capacity Intelligence

See where the truck loses time.

Examine arrival, queue, gate, yard and handling events together.

Ports & Logistics Infrastructure Design partner programme

edge. Port flow reviewIllustrative
Follow the visit through the terminalVisit P-101 · external wait and internal dwell
APPROACHGATEYARDEXIT30 min8 min34 min6 min
0130 minApproach
028 minGate
0334 minYard
046 minExit
78 minTotal visit
30 minExternal queue
48 minInside terminal
For

Traffic managers, terminal operations, planning and logistics infrastructure teams

The output

A measured flow baseline, operating scenarios and an intervention evaluation.

Engagement

A focused first engagement

What you receive

A flow baseline and operating options.

Journey baseline

Time and variability across the agreed arrival, gate, yard, handling and exit stages.

Constraint analysis

The relationship between arrival patterns, service capacity and observed queues.

Operating scenario comparison

Potential changes assessed with explicit assumptions and the affected operating teams.

Intervention review

Subsequent results compared with the baseline, including changes in demand and conditions.

Illustrative view of truck lanes, containers and handling equipment at a port
Operating contextEDGE / PORTS

An illustrative engagement

A congested terminal gate

A terminal review tests whether arrival clustering, gate staffing or yard availability explains long truck turnaround before selecting an intervention.

The review file connects
01

Gate and yard timestamps

02

Appointments and arrival patterns

03

Shift and resource records

Explore the working sampleProposed use case · not a customer result

How it works

From the source to the receiving team.

  1. 01

    Set the journey boundary

    Agree the terminal, cargo flow, event definitions and period to examine.

  2. 02

    Validate the event record

    Match identifiers and timestamps, inspect missing stages and establish a baseline.

  3. 03

    Test operating options

    Compare appointment, capacity or scheduling alternatives with the responsible teams.

  4. 04

    Evaluate an approved change

    Measure the full journey after implementation and record relevant contextual changes.

Scope & evaluation

Agree the evidence.
Define a useful result.

Use the details below to assess fit with your workflow.

01 Evidence requirements5 inputs
  • Terminal and gate event exports
  • Appointment and arrival records
  • Authorised vehicle movement data
  • Yard, loading and weighbridge events
  • Operating schedules and resource availability
02 Evaluation measures4 measures
  • Median and high-percentile total turnaround
  • Queue and service time by stage
  • Arrival and processing variability
  • Throughput within the agreed service boundary
03 Scope and outputs in detail

A landside review begins by agreeing the boundaries of the truck journey. The programme connects authorised timestamps and operational records, identifies where variation accumulates and evaluates changes such as appointment rules, staffing, gate allocation or operating windows.

Outputs to assess

  • A journey-stage baseline
  • A comparison of operating options
  • An evaluation plan for the approved intervention

Scope, permissions, integrations and acceptance criteria are agreed before work begins. Your authorised team retains the institutional decision.

Supporting instruments

Keep the evidence connected.

Explore ports & infrastructure solutions

Questions

Can the analysis work with an existing terminal system?

Yes. The initial scope uses authorised exports from the relevant systems. Any recurring interface is agreed with the terminal and system owner.

How are queues outside the gate treated?

The scope defines the complete journey and available observation points. External waiting is included where suitable evidence exists; missing coverage remains visible.

How do you establish whether a change helped?

The evaluation compares agreed measures with the baseline while examining demand, operating conditions and other changes. The design is agreed before the intervention where practical.

The next conversation

Start with this workflow.

Bring a representative set of records and the team responsible for assessing the output.

Start a conversation

Talk to the desk.

Tell us who you are and the decision you are pricing. The first conversation costs nothing. A reply comes on working days.

Or write to [email protected].